2 week delay. CNC machine went down slowed the shop up. They ask if it would put me in a bind . I said it was fine so two extra weeks.
Printable View
2 week delay. CNC machine went down slowed the shop up. They ask if it would put me in a bind . I said it was fine so two extra weeks.
[QUOTE=Smitty901;589597]
The Dealer that will be installing mine has done custom installs on other wet heads. In those cases they were refitting older HD cars to newer wet heads
[/QUOTE]
Smitty, I'm very interested in the older retro fit. Do you know if they make their own mounts or if there is a specific kit for older TLE on a '18 or '19 touring bike?
[QUOTE=Tramp;602106]Smitty, I'm very interested in the older retro fit. Do you know if they make their own mounts or if there is a specific kit for older TLE on a '18 or '19 touring bike?[/QUOTE]
tom ..
just an fyi we are right in east windsor and build trikes and mount side cars make mounts as needed
more than welcome to stop by
[QUOTE=stacebg;602125]tom ..
just an fyi we are right in east windsor and build trikes and mount side cars make mounts as needed
more than welcome to stop by[/QUOTE]
I work in East Hartford, and can stop by on the way home some afternoon,
would like to get your thoughts on a retrofit.
thanks
[QUOTE=Tramp;602406]I work in East Hartford, and can stop by on the way home some afternoon,
would like to get your thoughts on a retrofit.
thanks[/QUOTE]
sure most any time
stace welding
100 newberry rd
walmart is on my corner 1 mile on the right
exit 44 off 91 staight across rt 5
The cost goes up. But Experience teaches us that . The Painter called yesterday, he works for Hannigan. Like many good painter he wants to make it look it's best, with the bike. We went over some options to make the paint even better. The out come is the bottom will be black. Top Black hills gold with Black Quartz panels to match the bike . The chrome seam cover will be removed and filled pin striped to match the bike pin stripes. The extra colors pin stripes filling added 905$ to the cost. So total cost of all paint work will come to $2,000 Wife agreed better to just get it over with now and not have to deal with any other paint latter. 43 years ago when we were married just paying rent was hard to keep up with on Army pay.
Still looks like Sept 15 to finish build and ship.
Made the ride down to Murray Ky Sunday came back Monday. It was a great ride right at 1,200 miles round trip. I could have just mailed the check, but save a 50 cents for the stamp. I just wanted to go for a ride anyway.
It is built, waiting on the Harley Black Hills gold paint. The body is in line for the paint booth.
Here is the brake down on the car it's self. Like everything else it is all the extras you want or need that really add up. $10,487.62
The basic car Twin Classic Mounts made for 2017 RGU. $5295.00
Mag Wheel upgrade 65.00
Disc Brake 695.00
ECC Electric camber control 695.00
Lighted Spoiler 245.00
Cup Holder 35.00
Plug Accessory 12 volt/dual UBS 50.00
Seat belt 55.00
Convertible Top 595.00
Color match, Black hills gold and black Quartz two color pin stripes 1,395.00
Lower seal filled and painted
Color match Spoiler 100.00
Crate for shipping 195.00
Prepaid shipping 392.62
Another 10 day delay. The Black hills Gold paint had to come from HD. It took longer than expected to get it. I had some what expected that and was going to get it myself ahead of time.
Should have stuck with that plan. So now looking at Sept 25 as the build day.
Call came yesterday. it is built and painted being crated to ship 24th or 25th. Now I wonder if the shipping company will delay it.
Patience, Patience, all good things take time with out any reasoning :clapping: I’m sure it will be a thing of beauty.
[QUOTE=1dn5up;612298]Patience, Patience, all good things take time with out any reasoning :clapping: I’m sure it will be a thing of beauty.[/QUOTE]
The older I get the less I get worked up over delays. Payton is the getting excited. Last week she said we should go down and help them finish it.
It was turned over to the trucking company today. Should be here Monday Oct 1.
It has arrived.
[url=https://flic.kr/p/2bxRn1w][img]https://farm2.staticflickr.com/1974/44992702762_03db2405b3_z.jpg[/img]
[url=https://flic.kr/p/2bC5oTD][img]https://farm2.staticflickr.com/1966/45040511531_07a13b0338_z.jpg[/img]
[url=https://flic.kr/p/2bxR7Au][img]https://farm2.staticflickr.com/1939/44992654272_46a2477e34_z.jpg[/img]
[url=https://flic.kr/p/2bxReuQ][img]https://farm2.staticflickr.com/1922/44992677492_887f533f8c_z.jpg[/img]
love that color
[QUOTE=stacebg;615519]love that color[/QUOTE]
Like most colors it looks different depending on lighting . Looking forward to Payton's first ride in it.
The frame was attached to the bike Yesterday. tech was getting the wiring done. Should be ready soon.
This journey is almost over. Was in town this morning and saw the tech out riding it. He is either making adjustments or on a joy rider. Either way the end is near.
It is DONE. Took of for a 150 miles of playing with. Very happy with it.
[url=https://flic.kr/p/PzFDq7][img]https://farm2.staticflickr.com/1944/31229947698_2b08219af6_z.jpg[/img]
Spectacular looking.
:goodjob: Robert.
That’s a REAL BEAUTY......enjoy that ride & give us UPDATES!
:p
Looking good Robert, enjoy !!!